Addis Ababa Light Rail Transit (AA-LRT) 132kV GIS and Transmission Line Project
Addis Ababa Light Rail Transit (AA-LRT) 132kV GIS and Transmission Line Project
SPTTC completed the construction of the two 132kV substations and put them into operation in only five months, which set a construction speed record and paved the way for Africa’s first light rail transit system being put into operation on schedule.
Project Name | Addis Ababa Light Rail Transit (AA-LRT) 132kV GIS and Transmission Line Project |
Project Description | Package 2: 132kV Minilik GIS and 132kV Ayat GIS Construction and commissioning of gas insulated substations (GIS), switch yards and related transmission lines, and supply of materials stipulated in the contract between the contractor and the subcontractor. |