KENYA POWER DISTRIBUTION SYSTEM MODERNIZATION AND STRENGTHENING PROJECT PHASE II (Lot-1)
Kenya
SPTTC’s 220 kV transmission line project in Kenya was its first project in East Africa. The project involved two 220 kV power transmission lines with a total route length of about 240 km. The construction was successfully and substantially completed in one year with an amazing SPTTC-style speed, which won SPTTC high praise from both the project owner and the prime contractor.
Project Name | KENYA POWER DISTRIBUTION SYSTEM MODERNIZATION AND STRENGTHENING PROJECT PHASE II (Lot-1) |
Project Description | KENYA POWER DISTRIBUTION SYSTEM MODERNIZATION AND STRENGTHENING PROJECT PHASE II (Lot-1): Rabai-Malindi-Garsen-Lamu Power Line and Associated Substations. 234 km of Rabai-Malindi-Garsen 220 kV transmission line was constructed by SPTTC. |