LV and MV Power Distribution Network Upgrade Project in Lubango, Angola

来源:      发布时间:2017/11/1 11:25:14     点击率:422

Angola

SPTTC’s power distribution project in Angola in 2004 was, practically, its first overseas EPC project. The design, supply and construction of the project won high praise from both the owner and the prime contractor, which laid a solid foundation for SPTTC’s further international market development.


Project Name

LV and MV Power Distribution Network Upgrade Project in Lubango, Angola

Project Description

The scope of works of the project: 

15 kV transmission lines with a total route length of 18.83 km; 6kV lines with a total route length of 3.59km; 0.4kV lines with a total route length of 32.2km. 

15 kV power cables for 72 cable circuits; 202 LV power cables.

Extension of two PS substations and new construction of three PS substations and 24 PST substations。